Does anyone have a preferred way of re swandwiching the plates together of 18s kw.Is there an easier way? | ||
|
![]() |
Kenneth, Assemble the pallet, and wheels on the top plate, then put the pillar plate on. It's probably backwards of what you were trying. Brian C. | |||
|
IHC Life Member Site Moderator ![]() |
Kenneth Here is a link to a post by David Abbe a few months ago showing another way. I try both ways, some times one way seems easier & then the next time it is the other way around. https://ihc185.infopop.cc/eve/f...?r=77010007#77010007 Tom | |||
|
![]() |
Thanks Tom and Brian! | |||
|